EMERGENCY RESPONSE SUPPORT

Before & after ceiling support emergency response in breezeway at McCarran Airport

DEMOLITION EMERGENCY RESPONSE SUPPORT AT MCCARRAN AIRPORT

DEMOLITION PROJECT BEGUN IN FEBRUARY WRAPPING UP IN MARCH 2019

Las Vegas Demolition and Environmental Services, LLC.® was called upon at 4am to respond to an emergency selective demolition support project at McCarran Airport. Issue at A/B gates breezeway.

Demolition scope:

Installation of shoring and bracing as needed to stabilize multiple electrical and communication conduit banks and various single lines.

Chip, break and removal of all stucco ceilings within the breezeway area around live power and communication lines that feed the entire McCarran Airport complex.

The Las Vegas Demolition 24 hour emergency response team support equipment vehicle

“McCarran Airport, breezeway between A and B gates in Las Vegas, Nevada”

The pictures show the precision work needed to work around the visible conduit lines below the ceiling and the hidden conduit lines above the ceiling lid.